Client: Slough Council / Network Rail
Overview
The bridge is a 4-lane dual carriageway structure spanning over 4 electrified railway lines, with pedestrian walkways on each side and a central island.
Through extensive experience in this sector, sophisticated, safe planning and innovative engineering techniques, we managed to deliver the project 8 weeks ahead of the target date and within budget, with zero accidents or incidents.
Scope
- Improved lifespan of structure
- Replacement of Bridge Bearings, renew waterproofing and joints. Strengthen Structure.
- Improved walkway drainage on both sides of the structure –
- Installation of Drainage system on structure such as drainage kerbs
and walkway drainage - Improved highway safety – PSV rating improved on structure.
- Anti-Suicide mesh installed to structure. Additional Lighting
improvement works. - Improved environment and landscaping – Drainage and vegetation
works undertaken. - Major resurfacing works to full depth reconstruction >8,000m2
- New Paving to footpaths. Over 800m of new kerbing Installed
- New central barrier installed – New pedestrian barriers installed